Verbally committed to 21 posts, 15 were put in the other 5 didn’t get finished cause there was roots and bricks in the way. The real reason why bricks were in the way is because they didn’t follow the distances I gave. I’m not talking 1 or 2 inches, I mean 8 inches off. So obviously at the end the measurements were off. Also if you don’t come out to survey you should assume there is roots everywhere. I mean this is your full time job. Avoid discount post hole fences, avoid, avoid.